1. |
16-Mar-2024 03:05 PM |
19-Apr-2024 01:00 PM |
19-Apr-2024 03:30 PM |
[Construction of Boundary wall Purkul Gaon Dehradun]
[57_SEC_OandM_PTCUL][2024_PTCU8_71474_1]
|
MD (Power Transmisison Corporation of Uttarakhand Limited)||SE Civil (Project)
|
2. |
16-Mar-2024 04:15 PM |
19-Apr-2024 01:00 PM |
19-Apr-2024 04:00 PM |
[Construction of Recharge pit at 132 Kv Substations swichyard Majra Dehradun]
[58_SEC_OandM_PTCUL_][2024_PTCU8_71478_1]
|
MD (Power Transmisison Corporation of Uttarakhand Limited)||SE Civil (Project)
|
3. |
16-Mar-2024 02:40 PM |
19-Apr-2024 01:00 PM |
19-Apr-2024 03:00 PM |
[Raising of Boundry wall at 132 Kv substation MAjra]
[56_SEC_OandM_PTCUL][2024_PTCU8_71470_1]
|
MD (Power Transmisison Corporation of Uttarakhand Limited)||SE Civil (Project)
|
4. |
15-Mar-2024 05:15 PM |
19-Apr-2024 03:30 PM |
20-Apr-2024 03:30 PM |
[Procurement of Emergency Restoration System Tension Tower at the Divisional Store of 400 KV Substation PTCUL Rishikesh]
[PTCUL/CandP-II/ERS-18/2023-24][2024_PTCU4_71371_1]
|
MD (Power Transmisison Corporation of Uttarakhand Limited)||SE (C and P)-II
|
5. |
22-Mar-2024 11:00 AM |
19-Apr-2024 04:00 PM |
22-Apr-2024 11:00 AM |
[Zinc coating of Draft tube gates, TRC outfall gates, Surge shaft gates and coating of outer periphery of MIV Inlet Outlet pipe surface at Vyasi HEP, Hathiyari]
[37/EE(M)/VP/2023-24][2024_UJVN_71551_1]
|
MD- UJVN||Director (Operation)||GM (YV)||EE (A)
|
6. |
22-Mar-2024 11:00 AM |
19-Apr-2024 04:00 PM |
22-Apr-2024 11:00 AM |
[Supply and application of coating material on Spiral casing inner surface, Stay Vane and Stay ring surface and inlet pipe inner surface of one unit of Vyasi power house, Hathiyari]
[36/EE(M)/VP/2023-24][2024_UJVN_71549_1]
|
MD- UJVN||Director (Operation)||GM (YV)||EE (A)
|
7. |
05-Mar-2024 10:00 AM |
19-Apr-2024 04:00 PM |
22-Apr-2024 04:00 PM |
[Design Engineering Manufacturing Fabrication Assembly Supply Installation Testing and commissioning of prewired complete Numerical relay panels for Generator Generator Transformer and unit Auxiliary Transformer protection after dismantling ]
[TN_10_TEST_23_24][2024_UJVN_70931_1]
|
MD- UJVN||Director (Operation)||GM (GV)||EE (M), RPS
|
8. |
16-Mar-2024 05:30 PM |
19-Apr-2024 05:00 PM |
20-Apr-2024 03:30 PM |
[Construction of security Hut at 132 Kv lakshar]
[60_SEC_OadnM_PTCUL][2024_PTCU8_71502_1]
|
MD (Power Transmisison Corporation of Uttarakhand Limited)||SE Civil (Project)
|
9. |
16-Mar-2024 06:10 PM |
19-Apr-2024 05:00 PM |
20-Apr-2024 04:00 PM |
[Prevent SwitchYard From Monsoon rain water at 132 Kv Substation Majra Dehradun]
[61_SEC_OandM_PTCUL][2024_PTCU8_71503_1]
|
MD (Power Transmisison Corporation of Uttarakhand Limited)||SE Civil (Project)
|
10. |
16-Mar-2024 11:00 AM |
19-Apr-2024 05:00 PM |
23-Apr-2024 11:00 AM |
[Supply, Installation, Testing and Commissioning of Generator Transformer (75MVA, 11/220KV, three phase) with all accessories, including dismantling of the existing transformer at 4x60 MW Chibro Power House]
[28e-EE-G-CPH-2023-24][2024_UJVN_71417_1]
|
MD- UJVN||Director (Operation)||GM (YV)||EE (G), Khodri
|