1. |
03-Sep-2025 06:55 PM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Preparation of DPR for construction of 24 meter span four lane class-A loading bridge in Lohia drain near Shiv Mandir between Pahaniya toll of NH 125 in Khatima constituency of Udham Singh Nagar district Under State plan]
[Bid Reference No- 1760 5AC Dated 28-08-2025(03)][2025_pwd_86869_1]
|
PWD||4th Circle U.S. Nagar
|
2. |
03-Sep-2025 06:55 PM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Preparation of DPR for the construction of Class-A loading two-lane bridge in place of Class-B loading unsafe bridge of 24 meter span located on the canal at km 4.00 of Khatima Chhinki Biriya Jhankat road in Nanakmatta of US Nagar dist Under SP]
[Bid Reference No- 1760 5AC Dated 28-08-2025(02)][2025_pwd_86868_1]
|
PWD||4th Circle U.S. Nagar
|
3. |
03-Sep-2025 06:55 PM |
18-Sep-2025 03:00 PM |
18-Sep-2025 03:30 PM |
[Preparation of DPR for the construction of 110 m span double lane Class-A loading bridge and 0.500 km road on Kailash river at Cheekaghat in Nanakmatta constituency of Udham Singh Nagar district Under State plan]
[Bid Reference No- 1760 5AC Dated 28-08-2025(01)][2025_pwd_86865_1]
|
PWD||4th Circle U.S. Nagar
|
4. |
03-Sep-2025 06:05 PM |
19-Sep-2025 05:00 PM |
22-Sep-2025 01:00 PM |
[UKRAULI - SITARGANJ - 2 WATER SUPPLY SCHEME of Block Sitarganj.]
[405/Nivida/34 Dated 01/09/2025][2025_MDPEY_86867_1]
|
MD (Drinking Water) Peyjal Nigam GoUK||CE - Kumaon Zone||SE, Constructuon Circle, U.S. Nagar
|
5. |
03-Sep-2025 06:00 PM |
19-Sep-2025 05:00 PM |
22-Sep-2025 01:00 PM |
[UKRAULI - SITARGANJ - 1 WATER SUPPLY SCHEME of Block Sitarganj.]
[405/Nivida/34 Dated 01/09/2025][2025_MDPEY_86862_1]
|
MD (Drinking Water) Peyjal Nigam GoUK||CE - Kumaon Zone||SE, Constructuon Circle, U.S. Nagar
|
6. |
03-Sep-2025 06:00 PM |
18-Sep-2025 12:00 PM |
18-Sep-2025 02:00 PM |
[Construction work of Type-04 residential building for Block Development Officer of Ramnagar development block.]
[1085/RWD/02-LEKHA/2025-26 DT- 03-09-2025][2025_RES_86864_2]
|
RES - Chief Engineer||SE - Nainital||EE - Nainital
|
7. |
03-Sep-2025 06:00 PM |
18-Sep-2025 12:00 PM |
18-Sep-2025 02:00 PM |
[Construction work of auditorium room in development block Okhalkanda.]
[1085/RWD/02-LEKHA/2025-26 DT- 03-09-2025][2025_RES_86864_1]
|
RES - Chief Engineer||SE - Nainital||EE - Nainital
|
8. |
03-Sep-2025 05:00 PM |
25-Sep-2025 04:00 PM |
26-Sep-2025 02:30 PM |
[11/EE(EM-SHP)/ RISHIKESH/2025-26]
[11/EE(EM-SHP)/ RISHIKESH/2025-26][2025_UJVN_86858_1]
|
MD- UJVN||Director (Project)||GM (Civil)
|
9. |
03-Sep-2025 05:00 PM |
19-Sep-2025 01:00 PM |
19-Sep-2025 01:30 PM |
[Consultancy Services for Preparing of D.P.R. for Construction of Two lane motor road including Two lane Bridges from Pancheshwar to Baltari at Indo-Nepal border in Uttarakhand State (App. Length 30.00 Kms)]
[3861/13PIU-03/2025 Dated 01/09/2025][2025_pwd_86860_1]
|
PWD||3rd Circle Pithoragarh
|
10. |
03-Sep-2025 04:30 PM |
09-Sep-2025 03:00 PM |
10-Sep-2025 01:00 PM |
[Construction of motor road from the main road to the front of Ramesh Kanyal house in Khatola Radhakantpur in Rudrapur constituency under District Plan Year 2025-2026.]
[Bid Reference No- 1827 3AC Dated 06-08-2025(02)][2025_pwd_86861_1]
|
PWD||4th Circle U.S. Nagar
|
11. |
03-Sep-2025 04:00 PM |
24-Sep-2025 04:00 PM |
26-Sep-2025 11:00 AM |
[Hiring of one no light non AC diesel vehicle M and M Bolero or equivalent along with driver on rent basis for 12 months for use as pool vehicle by Executive Engineers in GM CDHNP office Pashulok Rishikesh]
[01-2025-26-EE(HM-I) CDH Rishikesh][2025_UJVN_86824_1]
|
MD- UJVN||Director (Operation)||GM (YV)||DGM (HGC), Dakpatthar
|
12. |
03-Sep-2025 04:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 01:00 PM |
[For Engagement of Manpower]
[14/2025-26][2025_UPCL5_86857_1]
|
MD - UPCL||CE (Dist) Haridwar||SE (D) Haridwar||Accountant EE (Jwalapur)
|
13. |
03-Sep-2025 03:05 PM |
01-Oct-2025 03:00 PM |
01-Oct-2025 03:30 PM |
[Under CM Ghoshana No 87/2022, The Construction work of internal roads and drains etc. of Ward No. 59, Gujrada Mansingh in Mussoorie Constituency of Dehradun District under State Sector.]
[6072/1C-9/2025, Dated 28/08/2025][2025_pwd_86854_1]
|
PWD||9th Circle Dehradun
|
14. |
03-Sep-2025 03:00 PM |
18-Sep-2025 11:00 AM |
18-Sep-2025 01:00 PM |
[For Engagement of Skilled Manpower]
[13/2025-26][2025_UPCL5_86856_1]
|
MD - UPCL||CE (Dist) Haridwar||SE (D) Haridwar||Accountant EE (Jwalapur)
|
15. |
03-Sep-2025 01:45 PM |
22-Sep-2025 12:00 PM |
23-Sep-2025 12:00 PM |
[Tender no. 21/EDC(s)/2025-26]
[Tender no. 21/EDC(s)/2025-26][2025_UPCL4_86855_1]
|
MD - UPCL||CE (Dist) Garhwal||SE (D) Srinagar
|
16. |
03-Sep-2025 12:00 PM |
03-Oct-2025 03:00 PM |
04-Oct-2025 03:00 PM |
[Annual Maintenance Contract of 132 and 33 KV Switchyard of 132 KV Substation Manglore and Laksar and its associated 132KV lines ]
[CE/GZR-22/2025-26][2025_PTCUX_86852_1]
|
MD (Power Transmisison Corporation of Uttarakhand Limited)||C.E.(O/M) Garhwal Zone Roorkee
|
17. |
03-Sep-2025 11:30 AM |
17-Sep-2025 01:00 PM |
17-Sep-2025 02:00 PM |
[Improvement Work of Saung -Khalidhar light Vehicle road by Cement Concrete under State Sector in Kapkot Assembly Constituency of District Bageshwar (Length 4.430 Km)]
[3737/Nivida-01/2025-26 dated 26/08/2025][2025_pwd_86853_1]
|
PWD||1st Circle Almora
|
18. |
03-Sep-2025 11:10 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 12:30 PM |
[E.T. NO 14/2025-26]
[E T. No 14/2025-26][2025_UPCL9_86851_1]
|
MD - UPCL||CE (Dist) Kumaon||SE (D) Haldwani||EE (Ramnagar)
|
19. |
03-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
19-Sep-2025 11:30 AM |
[Supply, Erection and Commissioning of 12 W LED Based Solar Street Lights in District U.S. Nagar with 05 years warrantee and comprehensive Annual Maintenance Contract.]
[01 /UREDA/USN/LED-SSL/2025-26][2025_UREDA_86829_1]
|
Director (UREDA)||Chief Project Officer||Dy. CPO Rudraprayag
|
20. |
03-Sep-2025 11:00 AM |
18-Sep-2025 05:00 PM |
20-Sep-2025 11:00 AM |
[Design, Manufacture, Supply, Erection, Testing and Commissioning of 01 kw Off-Grid Solar PV Power Plants at various places of distt. U.S.Nagar including Five Years Annual Maintenance Comprehensive.]
[02/ UREDA/USN/SPP /2025-26][2025_UREDA_86835_1]
|
Director (UREDA)||Chief Project Officer||Dy. CPO Rudraprayag
|