Logo
Notices eProcurement System Government of Uttarakhand
 
Back
 
 
Search
Tender ID
Tender Title
Select Sorting Option Published Date Closing Date Tender ID
Enter Captcha    
 
Clear
 
The latest Tender documents issued by various Government Departments, Directorates, Organisations, Institutions and local bodies of Uttarakhand-UT are listed here.
 
 
S.No e-Published Date Bid Submission Closing Date Tender Opening Date Title and Ref.No./Tender ID Organisation Chain
1. 19-Sep-2020 06:55 PM 05-Oct-2020 01:00 PM 06-Oct-2020 01:00 PM [Maintenance Operation of 33 11 KV Sub-Stations associated HT LT lines attending breakdowns and complaints of consumers under EDD Mohanpur] [17/EDCRDDUN/2020-21][2020_UPCL4_26219_1] MD - UPCL||CE (Dist) Garhwal||SE (D) Dehradun (R)
2. 19-Sep-2020 06:55 PM 10-Oct-2020 04:00 PM 12-Oct-2020 11:00 AM [Annual Maintenance of Machine 1,2 and 3 of Mohammadpur Power House] [09/EE (MandG)/MPH/2020-21 ][2020_UJVN_26218_1] MD- UJVN||Director (Operation)||GM (RM and U)||DGM (M and U-YV)
3. 19-Sep-2020 06:00 PM 28-Sep-2020 10:00 AM 28-Sep-2020 11:00 AM [Supply of hatching trough and trays] [01/R.K.V.Y./2020-21][2020_DFSH2_25991_2] Director (Fisheries)||Joint Director (Plan)||Deputy Director (Plan)
4. 19-Sep-2020 05:10 PM 03-Oct-2020 03:00 PM 03-Oct-2020 03:30 PM [Construction of Girls Hostel at Govt. Polytechnic Sahiya Vikasnagar, Dehradun] [712/BRIDCUL/233/20 DATED 15.09.2020][2020_BRID3_26215_1] MD - BRIDCUL||General Manager (Civil/Project)||PM (Dehradun)
5. 19-Sep-2020 03:30 PM 19-Oct-2020 03:00 PM 19-Oct-2020 03:30 PM [Conducting River cross section survey and Topographical Survey of river Ganga and its tributaries and Construction of RCC Bench Mark Pillar along these rivers under National Hydrology Project (NHP) in Uttarakhand State] [03 /SE (R)/ NHP/ e-Tender/ 2020-21][2020_IRDCE_23831_2] IRD - Chief Engineer||Chief Engineer - (Design and Research), Roorkee||Supt. Engr, Basic Research Circle, Roorkee
6. 19-Sep-2020 12:00 PM 26-Sep-2020 10:00 AM 26-Sep-2020 11:00 AM [Installation and Commissioning of Traffic signal in Haldwani City and Udhamsinghnagar] [DG-III-319/2020][2020_DGPV_25272_2] Director General (Police)||ADG - Administration||DIG P and M||AIG HQ
7. 19-Sep-2020 11:00 AM 09-Oct-2020 05:00 PM 15-Oct-2020 11:00 AM [EPC of 22 MW Cogen amd Sugar Mill Modernization] [01/EE(BBCGPP)/2020-21][2020_UJVN_26214_1] MD- UJVN||Director (Operation)||DGM (MM and C)
8. 19-Sep-2020 10:00 AM 12-Oct-2020 03:00 PM 13-Oct-2020 02:00 PM [Replacement of bare conductor by AB Cable] [EDC( USN) 20/2020-21][2020_UPCL3_26202_1] MD - UPCL||CE (Dist) Rudrapur||SE (D) Rudrapur
9. 19-Sep-2020 10:00 AM 15-Oct-2020 03:00 PM 16-Oct-2020 02:00 PM [Replacement of bare conductor by AB Cable.] [EDC(USN)23/2020-21][2020_UPCL3_26206_1] MD - UPCL||CE (Dist) Rudrapur||SE (D) Rudrapur
10. 19-Sep-2020 10:00 AM 14-Oct-2020 03:00 PM 15-Oct-2020 02:00 PM [Construction of 33KV line Haldi, Khatima to Khankat Sub Station.] [EDC(USN)22/2020-21][2020_UPCL3_26205_1] MD - UPCL||CE (Dist) Rudrapur||SE (D) Rudrapur
 
Contents owned and maintained by Government of Uttarakhand